Fuel Gas Skid Trainer
Generic dual-path turbine fuel · PIC-101 / FV-102 LSS · PSV → HP flare
sim2.northridgeenergysolutions.com
PIC-100PSIG
Upstream supply PIC
SP
PV598.
MODE
OT0.0
PIC-101PSIG
PV-101 → header pressure
SP
PV250.
MODE
OT15.0
PIC-102PSIG
Backup PIC · LSS A
SP
PV250.
MODE
OT55.0
HIC-102% Open
Manual · LSS B
PV35.0
MODE
OT
LSS → FV-102
min(55.0, 35.0) = 35.0
WINNER: HIC-102
Keep HIC-102 below PIC-102 OT
Total Turbine Fuel
96.0 MMSCFD
250. PSIG
DRY GAS SUPPLY600 PSIGJPV-10115.0% open60.0 °FV-101FG SEPARATOR250 psig · 0.0%ESD BYPASSED52.8 MMSCFDG/GFV-10235.0% openV-102 LTS250 psig · 15.0 °F · 43.2 MMSCFDESD BYPASSEDTGTURBINESHDR 250 psigPSV-101 / PSV-102 set 275 psig → HP flareHIHI / HIGH PRESS on FG & LTSYellow = process gas · Cyan = measured flow/temp · Green PV · Red SP · Blue OT
PV-101 leg flow
52.8 MMSCFD
15.0% open · V-101 250 psig
FV-102 leg flow
43.2 MMSCFD
35.0% open · V-102 250 psig
HP flare load
0.00 MMSCFD
PSVs seated (set 275 psig)